Loading Events

New EU Machinery Regulation: Is Your Test Bench Ready for 2027?

From 20 January 2027, the new EU Machinery Regulation (EU) 2023/1230 will replace the current Machinery Directive 2006/42/EC. If you are commissioning, modifying, extending or relocating a machine, test bench or test rig, your project may be affected by the new requirements.

ENORISE can help you determine which requirements apply and what needs to be done before your equipment goes into operation.

What changes on 20 January 2027?

The key date is 20 January 2027:

  • Equipment placed on the market or put into service before this date remains subject to the Machinery Directive.
  • Equipment placed on the market or put into service from this date must comply with the new Machinery Regulation.
  • There is no further transition period.
 
The new Regulation also introduces requirements covering protection against cyberattacks, safety software and AI, and digital instructions.

When is a modification considered substantial?

If you modify an existing machine or test bench, the key question is whether the change is considered a “substantial modification” under Article 3(16).

A modification is substantial only if all four criteria are met:
  • Not foreseen: the manufacturer neither foresaw nor planned the modification.
  • After placing on the market: hardware or software is changed after placing on the market.
  • New hazard: a new hazard appears or an existing risk increases.
  • Extra protection needed: new guards affecting the safety control system, or stability measures, are required.

What happens if all four criteria are met?

If all four criteria are met, you are deemed the manufacturer under Article 18.

This means that the risk assessment, technical documentation, conformity assessment, EU Declaration of Conformity and CE marking must be redone.

How can ENORISE support you?

ENORISE can help you assess your project and determine what needs to be done:

  • Regulation check: for machines designed under the Machinery Directive and going into service after 20 January 2027.
  • Substantial modification assessment: for machines, test benches or test rigs being modified, extended or relocated.
  • Recertification support: when the assessment identifies a substantial modification.

Is your project concerned?

Planning a modification, relocation or commissioning around or after 20 January 2027?
ENORISE can review your project before it goes into operation.

FAQ

When does the EU Machinery Regulation 2023/1230 apply?

It applies from 20 January 2027, when Machinery Directive 2006/42/EC is repealed. There is no further transition period.

A modification is substantial under Article 3(16) only when all the defined criteria are met.

Yes. ENORISE can assess a planned modification, extension or relocation against the substantial modification criteria and document the result in an expert report.

enorise-ambition
enorise-strenght
2026.11.24